1)7 light switches replaced–new box inside and switchplate
2) move 2 storm doors–front to back and vice versa
3) glued glass onto a cabinet–4 cabinets
4) tear out and install new bathroom vanity and replace some plumbing and faucet
5) adjusted an outside door that had a gap in it.

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google
  • Blogosphere News
  • feedmelinks
  • Global Grind
  • LinkedIn
  • StumbleUpon
  • TwitThis

Tagged with:

Filed under: Home Repair